Congratulations!

[Valid KML 2.2] This is a valid KML 2.2 feed.

Recommendations

This feed is valid, but interoperability with the widest range of feed readers could be improved by implementing the following recommendations.

Source: http://api.mankatomn.gov/api/engineeringprojectskml

  1. <?xml version="1.0" encoding="utf-16"?><kml xmlns="http://www.opengis.net/kml/2.2"><Document><name>Mankato Construction Projects</name><Style id="line_style"><LineStyle><color>ff0000aa</color><width>2</width></LineStyle></Style><Style id="shape_style"><LineStyle><color>ffffaa55</color></LineStyle><PolyStyle><color>7fffaa00</color></PolyStyle></Style><Folder id="FeatureLayer_111"><name>N Belmont Drive</name><description>Reconstruction of Belmont Drive from Main Street to Fair Street.</description><Placemark id="ID_111_1"><name>N Belmont Drive</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Belmont Drive from Main Street to Fair Street.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p class="ISB"&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot, and sidewalk on the east side of the road. &lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/111'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.97496229452354,44.15970057514485,0  -93.9750266675399,44.162763852040996,0  -93.97483354849082,44.16285620967837,0  -93.97275215429526,44.16285620967837,0  -93.97264486593467,44.162933174265746,0  -93.97265559477073,44.16320254953089,0</coordinates></LineString></Placemark><Placemark id="ID_111_2"><name>N Belmont Drive</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Belmont Drive from Main Street to Fair Street.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p class="ISB"&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot, and sidewalk on the east side of the road. &lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/111'&gt;View site&lt;/a&gt;</description></Placemark></Folder><Folder id="FeatureLayer_112"><name>Germania Park Phase 4</name><description>Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.</description><Placemark id="ID_112_1"><name>Germania Park Phase 4</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, sanitary sewer, water main, storm drains were needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process.&lt;span&gt;  &lt;/span&gt;This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/112'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.99579934442455,44.18789806410648,0  -94.00015525186474,44.18799038238709,0</coordinates></LineString></Placemark><Placemark id="ID_112_2"><name>Germania Park Phase 4</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, sanitary sewer, water main, storm drains were needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process.&lt;span&gt;  &lt;/span&gt;This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/112'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.9970868047517,44.18791345049663,0  -93.9970868047517,44.18668252659358,0</coordinates></LineString></Placemark><Placemark id="ID_112_3"><name>Germania Park Phase 4</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, sanitary sewer, water main, storm drains were needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process.&lt;span&gt;  &lt;/span&gt;This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/112'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.99869613016064,44.18671330000443,0  -93.99852446878369,44.18923666502325,0</coordinates></LineString></Placemark><Placemark id="ID_112_4"><name>Germania Park Phase 4</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, sanitary sewer, water main, storm drains were needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process.&lt;span&gt;  &lt;/span&gt;This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/112'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.00026254022534,44.1867594600906,0  -94.00006942117626,44.18925205106395,0</coordinates></LineString></Placemark><Placemark id="ID_112_5"><name>Germania Park Phase 4</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Lind St from 3rd Ave to 6th Ave, 4th Ave from Harper St to Lind St, 5th Ave from Harper St to Cleveland St, 6th Ave from Harper St to Cleveland St.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, sanitary sewer, water main, storm drains were needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process.&lt;span&gt;  &lt;/span&gt;This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/112'&gt;View site&lt;/a&gt;</description></Placemark></Folder><Folder id="FeatureLayer_114"><name>2024 Resurfacing and Misc Sidewalks</name><description>Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.</description><Placemark id="ID_114_1"><name>2024 Resurfacing and Misc Sidewalks</name><description>&lt;p&gt;&lt;i&gt;Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include full depth reclamation, bituminous surfacing, select curb and gutter, and ADA accessibility improvements.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/114'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.95413179064361,44.15655485149862,0  -93.95125646257965,44.15656254878389,0  -93.9509775128421,44.156647218855724,0  -93.95062346125214,44.15686274212673,0  -93.95049471521942,44.15710135625852,0  -93.95048398638336,44.15947205069789,0</coordinates></LineString></Placemark><Placemark id="ID_114_2"><name>2024 Resurfacing and Misc Sidewalks</name><description>&lt;p&gt;&lt;i&gt;Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include full depth reclamation, bituminous surfacing, select curb and gutter, and ADA accessibility improvements.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/114'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.95048398638336,44.159110295042574,0  -93.95415324831573,44.159110295042574,0</coordinates></LineString></Placemark><Placemark id="ID_114_3"><name>2024 Resurfacing and Misc Sidewalks</name><description>&lt;p&gt;&lt;i&gt;Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include full depth reclamation, bituminous surfacing, select curb and gutter, and ADA accessibility improvements.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/114'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.95049471521942,44.15826362420037,0  -93.95413179064361,44.15824823007262,0</coordinates></LineString></Placemark><Placemark id="ID_114_4"><name>2024 Resurfacing and Misc Sidewalks</name><description>&lt;p&gt;&lt;i&gt;Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include full depth reclamation, bituminous surfacing, select curb and gutter, and ADA accessibility improvements.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/114'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.95049471521942,44.15740154686025,0  -93.9541103329715,44.15738615250757,0</coordinates></LineString></Placemark><Placemark id="ID_114_5"><name>2024 Resurfacing and Misc Sidewalks</name><description>&lt;p&gt;&lt;i&gt;Pavement Rehabilitation of Cougar Drive, Lynx Lane, Cheetah Lane and Panther Lane.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include full depth reclamation, bituminous surfacing, select curb and gutter, and ADA accessibility improvements.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/114'&gt;View site&lt;/a&gt;</description></Placemark></Folder><Folder id="FeatureLayer_121"><name>W 7th Street</name><description>Reconstruction of W 7th Street from Sibley Street to Owatonna Street.</description><Placemark id="ID_121_1"><name>W 7th Street</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of W 7th Street from Sibley Street to Owatonna Street.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot, and replacement of existing sidewalk.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/121'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.0244765667739,44.15615232226052,0  -94.0209467797103,44.156183111605664,0</coordinates></LineString></Placemark><Placemark id="ID_121_2"><name>W 7th Street</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of W 7th Street from Sibley Street to Owatonna Street.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot, and replacement of existing sidewalk.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/121'&gt;View site&lt;/a&gt;</description></Placemark></Folder><Folder id="FeatureLayer_122"><name>Woodshire Drive</name><description>Reconstruction of Woodshire Drive from Madison Avenue to the northern terminus and Maple Lane from Woodshire Drive to the western terminus.</description><Placemark id="ID_122_1"><name>Woodshire Drive</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Woodshire Drive from Madison Avenue to the northern terminus and Maple Lane from Woodshire Drive to the western terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot and replacement of existing sidewalk.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/122'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.9862780864193,44.16872107042795,0  -93.98430398058434,44.16933672310213,0  -93.98432543825646,44.169659938183635,0  -93.98446491312524,44.169729198327786,0  -93.98464730333825,44.16975228502445,0  -93.98490479540368,44.16972150276025,0  -93.98587039064904,44.17113747028612,0</coordinates></LineString></Placemark><Placemark id="ID_122_2"><name>Woodshire Drive</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Woodshire Drive from Madison Avenue to the northern terminus and Maple Lane from Woodshire Drive to the western terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot and replacement of existing sidewalk.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/122'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -93.98556998323937,44.16952911324496,0  -93.9848726088955,44.169729198327786,0</coordinates></LineString></Placemark><Placemark id="ID_122_3"><name>Woodshire Drive</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of Woodshire Drive from Madison Avenue to the northern terminus and Maple Lane from Woodshire Drive to the western terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including replacement of all pavement, curb and gutter, sanitary sewer, watermain, storm drains, services to each lot and replacement of existing sidewalk.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/122'&gt;View site&lt;/a&gt;</description></Placemark></Folder><Folder id="FeatureLayer_123"><name>Germania Park Phase 5</name><description>Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.</description><Placemark id="ID_123_1"><name>Germania Park Phase 5</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process. This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/123'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.00019733684033,44.18797172053738,0  -94.00281517283887,44.1880563455277,0</coordinates></LineString></Placemark><Placemark id="ID_123_2"><name>Germania Park Phase 5</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process. This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/123'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.0014526106593,44.18927185471012,0  -94.00278298633069,44.189318012792626,0</coordinates></LineString></Placemark><Placemark id="ID_123_3"><name>Germania Park Phase 5</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process. This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/123'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.00282590167492,44.18934109182034,0  -94.00292246119946,44.186748491197804,0</coordinates></LineString></Placemark><Placemark id="ID_123_4"><name>Germania Park Phase 5</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process. This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/123'&gt;View site&lt;/a&gt;</description><styleUrl>#line_style</styleUrl><LineString><tessellate>1</tessellate><coordinates> -94.00146333949536,44.18926416169282,0  -94.00162427203625,44.1866946377504,0</coordinates></LineString></Placemark><Placemark id="ID_123_5"><name>Germania Park Phase 5</name><description>&lt;p&gt;&lt;i&gt;Reconstruction of 7th Avenue from Harper Street to Cleveland Street, 8th Avenue from Harper Street to Cleveland Street, Lind Street from 6th Avenue to the eastern terminus and Cleveland Street from 7th Avenue to the eastern terminus.&lt;/i&gt;&lt;/p&gt;&lt;p&gt;Suggested improvements include complete reconstruction including complete replacement of all pavements, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete curb and gutter and driveways as applicable. These improvements were determined though a review and evaluation of city infrastructure and an extensive public engagement process. This was done to provide context sensitive improvements that mentioned the reliability of service for the neighborhood.&lt;/p&gt;&lt;a href='https://city.mankatomn.gov/streetprojects/detail/123'&gt;View site&lt;/a&gt;</description></Placemark></Folder></Document></kml>

If you would like to create a banner that links to this page (i.e. this validation result), do the following:

  1. Download the "valid KML 2.2" banner.

  2. Upload the image to your own server. (This step is important. Please do not link directly to the image on this server.)

  3. Add this HTML to your page (change the image src attribute if necessary):

If you would like to create a text link instead, here is the URL you can use:

http://www.feedvalidator.org/check.cgi?url=http%3A//api.mankatomn.gov/api/engineeringprojectskml

Copyright © 2002-9 Sam Ruby, Mark Pilgrim, Joseph Walton, and Phil Ringnalda