Congratulations!

[Valid RSS] This is a valid RSS feed.

Recommendations

This feed is valid, but interoperability with the widest range of feed readers could be improved by implementing the following recommendations.

Source: http://www.cerebraldonkey.com/traffic/rss.php

  1. <?xml version="1.0"?><rss version="2.0">
  2.  <channel>
  3.    <title>Saskatoon Traffic Detours</title>
  4.    <link>http://www.saskatoon.ca/org/news_releases/traffic_detours.asp</link>
  5.    <description>City of Saskatoon traffic detours feed.</description>
  6.    <language>en-us</language>
  7.         <item>
  8.  <title>Portion Of 11th Street West To Be Closed Starting Thursday, July 4</title>
  9.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/PORTIONOF11THSTREETWESTTOBECLOSEDSTARTINGTHURSDAYJULY4.aspx</link>
  10.  <pubDate>Wed, 03 Jul 2013 21:15:08 +0000</pubDate>
  11.  <description>
  12. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;p&gt;&lt;span lang=EN-US&gt;&lt;strong&gt;For Immediate Release:  July 3, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;CM13-129&lt;/span&gt;&lt;/p&gt;
  13. &lt;p&gt;&lt;span lang=EN-US&gt;Starting Thursday, July 4 at 9:00 a.m., a portion of 11&lt;sup&gt;th&lt;/sup&gt; Street West from the new Circle Drive on-ramp to Avenue W will be closed as part of the Circle Drive South Project.  Crews are installing a new water and sewer connection, and the roadway will be opened up late Monday July 8, weather permitting.&lt;/span&gt;&lt;/p&gt;
  14. &lt;p&gt;&lt;span lang=EN-US&gt;Detour signs will be in place, and motorists will be directed to use 22&lt;sup&gt;nd&lt;/sup&gt; Street and Avenue W as detour routes around the work area.  Local access to businesses in that area will still be maintained via the detour routes. (So traffic wishing to head east out of Montgomery Place will take 11&lt;sup&gt;th&lt;/sup&gt; Street and turn right onto the new on-ramp just east of the new overpass, and go north on Circle Drive to 22&lt;sup&gt;nd&lt;/sup&gt; Street, and then turn right to head east.  Motorists heading west to Montgomery Place along 11&lt;sup&gt;th&lt;/sup&gt; Street, will turn north (right) at Avenue W to 22&lt;sup&gt;nd&lt;/sup&gt; Street, then west to Circle Drive, then south on Circle Drive). &lt;/span&gt;&lt;/p&gt;
  15. &lt;p&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  16. &lt;p&gt;&lt;span lang=EN-US&gt;The Circle Drive South Project is Saskatoon' - s largest infrastructure project, involving a new south bridge, five interchanges, three railway grade separations, and 10 kilometres of freeway.  &lt;/span&gt;&lt;/p&gt;
  17. &lt;p&gt;&lt;b&gt;&lt;span lang=EN-US&gt;Drivers are reminded to allow extra time when travelling through the orange zone, watch for pedestrians and work crews, and for everyone' - s safety, please obey all detours, signs and barriers. &lt;/span&gt;&lt;/b&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  18. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  19. &lt;p&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  20. &lt;p&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  21. &lt;p align=center&gt;&lt;span lang=EN-US&gt;-30-&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  22. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  23. </description>
  24.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/PORTIONOF11THSTREETWESTTOBECLOSEDSTARTINGTHURSDAYJULY4.aspx</guid>
  25. </item>
  26.         <item>
  27.  <title>New Primary Water Main Installation on 37th Street Begins June 3, 2013</title>
  28.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/NewPrimaryWaterMainInstallationon37thStreetBeginsJune32013.aspx</link>
  29.  <pubDate>Thu, 30 May 2013 21:15:08 +0000</pubDate>
  30.  <description>
  31. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span&gt;&lt;/span&gt;
  32. &lt;p&gt;&lt;span&gt;&lt;strong&gt;For Immediate Release: May 30, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span&gt;IS13-186      &lt;/span&gt;&lt;/p&gt;
  33. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  34. &lt;p&gt;&lt;span&gt;Beginning at 9:00 a.m. on Monday, June 3, 37&lt;sup&gt;th&lt;/sup&gt; Street, from west of Junor Avenue to Latrace Road, will be closed for the installation of a new primary water main. The water main will provide service to the Hampton Village neighbourhood and the future west sector suburban development area. &lt;/span&gt;&lt;/p&gt;
  35. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  36. &lt;p&gt;&lt;span&gt;The work will be done in two- to three-block sections, with full closures along 37&lt;sup&gt;th&lt;/sup&gt; Street as work progresses. Detour signs will direct drivers and one entrance to adjacent crescents will be maintained at all times.&lt;/span&gt;&lt;/p&gt;
  37. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  38. &lt;p&gt;&lt;span&gt;This project is expected to take approximately four months to complete, weather permitting and barring unforeseen circumstances. &lt;span&gt;The City thanks everyone for their patience&lt;b&gt;. &lt;/b&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
  39. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  40. &lt;p&gt;&lt;b&gt;&lt;span&gt;Drivers are reminded to allow extra time when travelling through construction zones, watch for pedestrians and work crews, and for everyone' - s safety, please obey all detours, signs and barriers. &lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
  41. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  42. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find timely updates to roadway work with &lt;b&gt;Traffic Detour Service Alerts&lt;/b&gt; at &lt;/span&gt;&lt;/i&gt;&lt;i&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/go/alerts&quot;&gt;www.saskatoon.ca/go/alerts&lt;span&gt; and connect with us on Twitter and Facebook. &lt;/span&gt;&lt;/span&gt;&lt;/i&gt;&lt;/p&gt;&lt;/div&gt;
  43. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  44. </description>
  45.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/NewPrimaryWaterMainInstallationon37thStreetBeginsJune32013.aspx</guid>
  46. </item>
  47.         <item>
  48.  <title>Circle Drive South Zipper Merge - Watch for New Signs</title>
  49.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/CircleDriveSouthZipperMerge-WatchforNewSigns.aspx</link>
  50.  <pubDate>Wed, 29 May 2013 20:00:08 +0000</pubDate>
  51.  <description>
  52. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;p&gt;&lt;span lang=EN-US&gt;&lt;strong&gt;For Immediate Release: May 29, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;IS13-185&lt;/span&gt;&lt;/p&gt;
  53. &lt;p&gt;&lt;span lang=EN-US&gt;Following the success of the Zipper Merge through the construction zone on Circle Drive earlier this month, the City is adjusting signage to accommodate the merging technique at other locations.&lt;/span&gt;&lt;/p&gt;
  54. &lt;p&gt;&lt;span&gt;The next location where drivers will see the new Zipper Merge signage is along Circle Drive South approaching the new bridge overpass in both directions, beginning Saturday, June 1.    As drivers approach the ' - lane closed ahead' -  sign and traffic starts to back up, stay in your current lane up to the point of merge. Then take turns in &amp;quot;zipper&amp;quot; fashion with other drivers to safely and smoothly ease into the remaining lane.    &lt;b&gt;Drivers in the through lane must take turns merging.&lt;/b&gt;&lt;/span&gt;&lt;/p&gt;
  55. &lt;p&gt;&lt;b&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
  56. &lt;p&gt;&lt;span lang=EN-US&gt;The Zipper Merge eases traffic congestion and reduces collisions. Collisions and frustration occurs when one lane is stopped or very slow and the other lane is travelling at a high rate of speed and someone tries to move out into that lane.&lt;/span&gt;&lt;/p&gt;
  57. &lt;p&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  58. &lt;p&gt;&lt;span&gt;When most drivers see the first ' - lane closed ahead' -  sign in a work zone, they slow too quickly and move to the lane that will continue through the construction area. This driving behavior can lead to unexpected and dangerous lane switching, serious crashes and road rage.&lt;/span&gt;&lt;/p&gt;
  59. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  60. &lt;p&gt;&lt;b&gt;&lt;span lang=EN-US&gt;Drivers are reminded to please obey ALL signage approaching and within roadway construction zones.&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
  61. &lt;p&gt;&lt;b&gt;&lt;span&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
  62. &lt;p&gt;&lt;span lang=EN-US&gt;Saskatoon Police Service will be monitoring these areas and will be issuing fines for drivers who are not adhering to the signage.  &lt;a title=&quot;&quot; href=&quot;/DEPARTMENTS/Infrastructure%20Services/Transportation/Pages/ZipperMerge.aspx&quot;&gt;&lt;span lang=EN-US&gt;More information and a step-by-step video&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;span&gt;.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;
  63. &lt;p&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find timely updates to roadway work with &lt;b&gt;Traffic Detour Service Alerts&lt;/b&gt; at &lt;/span&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/go/alerts&quot;&gt;www.saskatoon.ca/go/alerts&lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt; &lt;i&gt;and connect with us on &lt;/i&gt;&lt;/span&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Twitter and Facebook&lt;/span&gt;&lt;span lang=EN-US&gt;.&lt;/span&gt;&lt;/i&gt;
  64. &lt;p&gt;&lt;/p&gt;&lt;/div&gt;
  65. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  66. </description>
  67.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/CircleDriveSouthZipperMerge-WatchforNewSigns.aspx</guid>
  68. </item>
  69.         <item>
  70.  <title>College Drive Pedestrian Overpass at Central Avenue Closing for Maintenance</title>
  71.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/CollegeDrivePedestrianOverpassatCentralAvenueClosingforMaintenance.aspx</link>
  72.  <pubDate>Tue, 28 May 2013 18:45:11 +0000</pubDate>
  73.  <description>
  74. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span lang=EN-US&gt;&lt;strong&gt;For Immediate Release: May 28, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;IS13-183&lt;/span&gt;&lt;span lang=EN-US&gt;
  75. &lt;p&gt;&lt;span lang=EN-US&gt;Beginning Thursday May 30, 2013, the College Drive pedestrian overpass connecting Central Avenue and Carleton Drive will be temporarily closed for maintenance to the stairway.  &lt;/span&gt;&lt;/p&gt;
  76. &lt;p&gt;&lt;span lang=EN-US&gt;Pedestrians and cyclists are advised to use the pedestrian walkway on the McKercher Drive overpass to cross College Drive.&lt;/span&gt;&lt;/p&gt;
  77. &lt;p&gt;&lt;span lang=EN-US&gt;The repairs are expected to take five days, weather permitting and barring any unforeseen circumstances. The City thanks everyone for their patience.&lt;/span&gt;&lt;/p&gt;
  78. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find timely updates to roadway work with &lt;b&gt;Traffic Detour Service Alerts&lt;/b&gt; at &lt;a title=&quot;&quot; href=&quot;/FORUM/Pages/alerts.aspx&quot;&gt;&lt;span lang=EN-US&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;i&gt;&lt;span lang=EN-US&gt;/go/alerts&lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt; &lt;/span&gt;&lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt;&lt;i&gt;and connect with us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;&lt;/span&gt;&lt;/div&gt;
  79. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  80. </description>
  81.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/CollegeDrivePedestrianOverpassatCentralAvenueClosingforMaintenance.aspx</guid>
  82. </item>
  83.         <item>
  84.  <title>Intersection at Faithful Avenue and 60th Street Closed for Ten Days</title>
  85.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/IntersectionatFaithfulAvenueand60thStreetClosedforTenDays.aspx</link>
  86.  <pubDate>Mon, 27 May 2013 20:45:08 +0000</pubDate>
  87.  <description>
  88. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;strong&gt;&lt;span lang=EN-US&gt;For Immediate Release&lt;/span&gt;&lt;span&gt;:  May 27, 2013&lt;/span&gt;&lt;span&gt; &lt;/span&gt;&lt;/strong&gt;&lt;span&gt;IS13-182&lt;/span&gt;&lt;span&gt;
  89. &lt;p&gt;&lt;span&gt;The reconstruction of the intersection at Faithful Avenue and 60&lt;sup&gt;th&lt;/sup&gt; Street will require a full closure, beginning Wednesday, May 29, 2013.  Traffic on 60&lt;sup&gt;th&lt;/sup&gt; Street will be detoured at Miners Avenue and Lambert Crescent.&lt;/span&gt;&lt;span&gt; &lt;/span&gt;&lt;/p&gt;
  90. &lt;p&gt;&lt;span&gt;The roadway is expected to reopen by Saturday, June 8, weather permitting and barring any unforeseen circumstances.  The City thanks everyone for their patience.&lt;/span&gt;&lt;/p&gt;
  91. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  92. &lt;p&gt;&lt;b&gt;&lt;span&gt;Drivers are reminded to allow extra time when travelling through construction zones, watch for pedestrians, cyclists and work crews, and for everyone' - s safety, please obey all detours, signs, and barriers.&lt;/span&gt;&lt;/b&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  93. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span&gt;  Find timely updates to roadway work with &lt;b&gt;Traffic Detour Service Alerts&lt;/b&gt; at &lt;a title=&quot;&quot; href=&quot;/FORUM/Pages/alerts.aspx&quot;&gt;&lt;i&gt;&lt;u&gt;&lt;span&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;/go/alerts&lt;/span&gt;&lt;/u&gt;&lt;/i&gt;&lt;/span&gt;&lt;/i&gt;&lt;span&gt; &lt;i&gt;and connect with us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  94. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  95. </description>
  96.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/IntersectionatFaithfulAvenueand60thStreetClosedforTenDays.aspx</guid>
  97. </item>
  98.         <item>
  99.  <title>Traffic Restricted on Dudley Street Starting Today, Friday, May 24</title>
  100.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictedonDudleyStreetStartingTodayFridayMay24.aspx</link>
  101.  <pubDate>Fri, 24 May 2013 22:45:09 +0000</pubDate>
  102.  <description>
  103. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span lang=EN-US&gt;&lt;strong&gt;For Immediate Release:  May 24, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;CM13-115&lt;/span&gt;
  104. &lt;p&gt;&lt;span lang=EN-US&gt;Starting this afternoon, Friday, May 24, Dudley Avenue between Schuyler Street and east to approximately Avenue X will be closed until early September as crews construct a new roadway entrance as part of the Circle Drive South Project.&lt;/span&gt;&lt;/p&gt;
  105. &lt;p&gt;&lt;span lang=EN-US&gt;The Schulyer Street intersection will remain open, and traffic can proceed along Schulyer Street to Avenue X.&lt;span&gt;  &lt;/span&gt;The new roadway entrance, called Dawes Avenue, will extend north from Dudley Street to 11&lt;sup&gt;th&lt;/sup&gt; Street West.&lt;span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
  106. &lt;p&gt;&lt;span lang=EN-US&gt;The Circle Drive South Project is Saskatoon' - s largest infrastructure project, involving a new south bridge, five interchanges, three railway grade separations, and 10 kilometres of freeway.  &lt;/span&gt;&lt;/p&gt;
  107. &lt;p&gt;&lt;b&gt;&lt;span lang=EN-US&gt;Drivers are reminded to allow extra time when travelling through the orange zone, watch for pedestrians and work crews, and for everyone' - s safety, please obey all detours, signs and barriers. &lt;/span&gt;&lt;/b&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  108. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  109. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  110. </description>
  111.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictedonDudleyStreetStartingTodayFridayMay24.aspx</guid>
  112. </item>
  113.         <item>
  114.  <title>Traffic Restrictions for Marathon on Sunday, May 26, 2013</title>
  115.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictionsforMarathononSundayMay262013.aspx</link>
  116.  <pubDate>Fri, 24 May 2013 18:00:07 +0000</pubDate>
  117.  <description>
  118. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span&gt;&lt;strong&gt;For Immediate Release: May 24, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span&gt;IS13-181&lt;/span&gt;
  119. &lt;p&gt;&lt;span&gt;To accommodate a marathon event on Sunday, May 26, from 6:30 a.m. to 2:00 p.m., no parking signs and traffic restrictions will be in place along marathon routes. The main road restrictions will include:&lt;/span&gt;&lt;/p&gt;
  120. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  121. &lt;ul&gt;
  122. &lt;li&gt;&lt;span lang=EN-US&gt;Full closure of Taylor Street between St. Henry Avenue and Victoria Avenue&lt;/span&gt;&lt;/li&gt;
  123. &lt;li&gt;&lt;span lang=EN-US&gt;Broadway Avenue southbound (curb lane) between the Broadway Bridge and 11&lt;sup&gt;th&lt;/sup&gt; Street&lt;/span&gt;&lt;/li&gt;
  124. &lt;li&gt;&lt;span lang=EN-US&gt;Full closure of Victoria Avenue between 11&lt;sup&gt;th&lt;/sup&gt; Street and Taylor Avenue&lt;/span&gt;&lt;/li&gt;
  125. &lt;li&gt;&lt;span lang=EN-US&gt;Spadina Crescent northbound from 20&lt;sup&gt;th&lt;/sup&gt; Street to Ravine Drive (&lt;span&gt;including northbound exit from University Bridge&lt;/span&gt;)&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;
  126. &lt;p&gt;&lt;span&gt;Drivers are encouraged to avoid the area during the event and watch for participants and officials. &lt;/span&gt;&lt;span&gt;The City thanks everyone for their patience.&lt;/span&gt;&lt;/p&gt;
  127. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;span&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  128. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  129. </description>
  130.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictionsforMarathononSundayMay262013.aspx</guid>
  131. </item>
  132.         <item>
  133.  <title>University Bridge Walkway and Ramp Restrictions Begin Tuesday, May 28</title>
  134.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/UniversityBridgeWalkwayandRampRestrictionsBeginTuesdayMay28.aspx</link>
  135.  <pubDate>Fri, 24 May 2013 15:15:07 +0000</pubDate>
  136.  <description>
  137. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span lang=EN-US&gt;
  138. &lt;p&gt;&lt;strong&gt;For Immediate Release: May 24, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;IS13-173&lt;/span&gt;&lt;/p&gt;
  139. &lt;p&gt;&lt;span lang=EN-US&gt;Repairs to the eastbound railing along &lt;/span&gt;&lt;span&gt;the University Bridge will require some restrictions, beginning Tuesday, May 28, 2013. Damage to the barrier and railing was caused by a vehicle accident this winter. &lt;/span&gt;&lt;/p&gt;
  140. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  141. &lt;p&gt;&lt;span&gt;The repairs will require the temporary closure of the following;&lt;/span&gt;&lt;/p&gt;
  142. &lt;ul&gt;
  143. &lt;li&gt;&lt;span&gt;Off ramp to Saskatchewan Crescent East&lt;/span&gt;&lt;/li&gt;
  144. &lt;li&gt;&lt;span&gt;South pedestrian ramp to the Meewasin Valley Trail&lt;/span&gt;&lt;/li&gt;
  145. &lt;li&gt;&lt;span&gt;Eastbound (south) walkway along the University Bridge&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;
  146. &lt;p&gt;&lt;span lang=EN-US&gt;The work is expected to take three days, weather permitting and barring any unforeseen circumstances. The City thanks everyone for their patience. &lt;/span&gt;&lt;/p&gt;
  147. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  148. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  149. </description>
  150.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/UniversityBridgeWalkwayandRampRestrictionsBeginTuesdayMay28.aspx</guid>
  151. </item>
  152.         <item>
  153.  <title>Traffic Restricted on 11th Street Starting Today, Tuesday, May 21</title>
  154.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictedon11thStreetStartingToday,Tuesday,May21.aspx</link>
  155.  <pubDate>Tue, 21 May 2013 16:15:07 +0000</pubDate>
  156.  <description>
  157. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span lang=EN-US&gt;For Release:  May 21, 2013&lt;/span&gt;&lt;span lang=EN-US&gt;CM13-113&lt;/span&gt;
  158. &lt;p&gt;&lt;span lang=EN-US&gt;Starting Tuesday, May 21 at 9:00 a.m., the eastbound lanes on 11&lt;sup&gt;th&lt;/sup&gt; Street just east of the new Circle Drive overpass will be closed, and two-way traffic will be accommodated in the westbound lanes.&lt;/span&gt;&lt;/p&gt;
  159. &lt;p&gt;&lt;span lang=EN-US&gt;The lanes will be closed as crews relocate a gas line as part of the Circle Drive South Project.&lt;span&gt;  &lt;/span&gt;The restrictions will remain in place until the work is completed Friday evening.&lt;span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
  160. &lt;p&gt;&lt;span lang=EN-US&gt;The Circle Drive South Project is Saskatoon' - s largest infrastructure project, involving a new south bridge, five interchanges, three railway grade separations, and 10 kilometres of freeway.  &lt;/span&gt;&lt;/p&gt;
  161. &lt;p&gt;&lt;b&gt;&lt;span lang=EN-US&gt;Drivers are reminded to allow extra time when travelling through the orange zone, watch for pedestrians and work crews, and for everyone' - s safety, please obey all detours, signs and barriers. &lt;/span&gt;&lt;/b&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;
  162. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span lang=EN-US&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span lang=EN-US&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span lang=EN-US&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  163. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  164. </description>
  165.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/TrafficRestrictedon11thStreetStartingToday,Tuesday,May21.aspx</guid>
  166. </item>
  167.         <item>
  168.  <title>Spadina Crescent and Broadway Avenue Road Closures on Saturday, May 18 and Monday, May 20, 2013 for Special Events</title>
  169.  <link>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/SpadinaCrescentandBroadwayAvenueRoadClosuresonSaturdayMay18andMondayMay20.aspx</link>
  170.  <pubDate>Fri, 17 May 2013 22:15:07 +0000</pubDate>
  171.  <description>
  172. &lt;div id=&quot;ctl00_PlaceHolderMain_RichHtmlField1__ControlWrapper_RichHtmlField&quot; style=&quot;display:inline&quot;&gt;&lt;span&gt;&lt;strong&gt;For Immediate Release: May 17, 2013&lt;/strong&gt;&lt;/span&gt;&lt;span&gt;IS13-178&lt;/span&gt;
  173. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;span&gt;On Saturday, May 18, from 4:30 p.m. to 8:30 p.m., Spadina Crescent/Whiteswan Drive northbound from 21st Street to Silverwood Road, including northbound exit from University Bridge, will be closed for the Bikes on Broadway event.&lt;/span&gt;&lt;/p&gt;
  174. &lt;p&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;
  175. &lt;p&gt;&lt;span&gt;On Monday, May 20, from 6:00 a.m. to 11:30 p.m., &lt;span&gt;Broadway Avenue will be closed from 11th Street to Main Street for the Bikes on Broadway and concert events.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
  176. &lt;p&gt;&lt;span&gt;The City thanks everyone for their patience.&lt;/span&gt;&lt;/p&gt;
  177. &lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;span&gt;Know before you go!&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;span&gt;  Find up-to-date Traffic Detour information on our website at &lt;/span&gt;&lt;/i&gt;&lt;span&gt;&lt;a href=&quot;/&quot;&gt;&lt;i&gt;&lt;span&gt;www.saskatoon.ca&lt;/span&gt;&lt;/i&gt;&lt;/span&gt;&lt;span&gt; &lt;i&gt;and follow us on Twitter, Facebook or our City Blog.&lt;/i&gt;&lt;/span&gt;&lt;span&gt;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
  178. &lt;!--&lt;div dir=&quot;&quot;&gt;&lt;/div&gt;--&gt;
  179. </description>
  180.  <guid>http://www.saskatoon.ca/FORUM/Traffic%20Detours/Pages/SpadinaCrescentandBroadwayAvenueRoadClosuresonSaturdayMay18andMondayMay20.aspx</guid>
  181. </item>
  182.      </channel>
  183. </rss>
  184.  

If you would like to create a banner that links to this page (i.e. this validation result), do the following:

  1. Download the "valid RSS" banner.

  2. Upload the image to your own server. (This step is important. Please do not link directly to the image on this server.)

  3. Add this HTML to your page (change the image src attribute if necessary):

If you would like to create a text link instead, here is the URL you can use:

http://www.feedvalidator.org/check.cgi?url=http%3A//www.cerebraldonkey.com/traffic/rss.php

Copyright © 2002-9 Sam Ruby, Mark Pilgrim, Joseph Walton, and Phil Ringnalda