Congratulations!

[Valid RSS] This is a valid RSS feed.

Recommendations

This feed is valid, but interoperability with the widest range of feed readers could be improved by implementing the following recommendations.

Source: https://www.realestatehomebuilder.com/feed/rss/

  1. <?xml version="1.0" encoding="UTF-8"?>
  2. <rss version="2.0"
  3. xmlns:content="http://purl.org/rss/1.0/modules/content/"
  4. xmlns:dc="http://purl.org/dc/elements/1.1/"
  5. xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
  6. >
  7. <channel>
  8. <title>RSS Construction Support</title>
  9. <link>https://www.realestatehomebuilder.com/</link>
  10. <description>Construction Support</description>
  11. <lastBuildDate>Sun, 17 Sep 2023 07:08:04 +0000</lastBuildDate>
  12. <language>en</language>
  13. <sy:updatePeriod>daily</sy:updatePeriod>
  14. <sy:updateFrequency>1</sy:updateFrequency>
  15. <item>
  16. <title>Estimated Construction Of A Wooden House</title>
  17. <description>1. Project home. The design of the house is perhaps the most important step in the construction process. It is precisely during the design period that all the submarines need to be thought of and, if possible, to protect ...</description>
  18. <content:encoded><![CDATA[<img src="/img/vse_o_stroitelstve_domov_kak_sostavlyaetsya.jpg" alt="Как составляется смета на" align="left" /><p>1. Project home. The design of the house is perhaps the most important step in the construction process. It is precisely during the design period that all the submarines need to be thought of and, if possible, to protect themselves from underwater stones. Recognize the characteristics of the material and place for the future construction of the house from the brushe. For a successful design, it is very important to determine what you want to see your future home. You can: select the ready project proposed by our company; amend the standard project; develop an individual project with the help of our designers. The project consists of three parts: a sketch project; production documents; collection documents. The complete composition of the project can be seen here in the manufacture of the domicile at our production, the entire copy of the documents - BESPLATE! 2. Slaughter factor. Our company is engaged in the construction of a probe cage and a bruise of a cranial cushion: two kinds of sections are possible for a glutch brushe: 200x185 (h)m and 160x185 (h)m. for a cellar bushion, two types of section: 190x192 (h)m and 140x142 (h)mm. The estimate for the manufacture of the cut consists of: the wrap and section of the brushe; the handling of the brushes of the flame retardant (Pyrilax-Lux) and Asfor Extra; the treatment of the Brush thorns by the protective composition (Teknos). The detailed composition of the estimate for the cut can be seen here: 3. It's on the foundation. Fundation is the fundamental part of the future home on which its sustainability and longevity depend. The nature of the foundation depends on the load, the type of soil on which the building will be built. First of all, geodetic work (ground drilling and sampling) is needed to determine the type and laying of the necessary foundation. Our company can build a foundation in Arkhangelsk and the arch, as local soils are well known to us. Indicators from other regions are invited to contact local organizations specializing in these activities.</p>]]></content:encoded>
  19. <category><![CDATA[Construction Estimates]]></category>
  20. <link>https://www.realestatehomebuilder.com/ConstructionEstimates/estimated-construction-of-a-wooden-house</link>
  21. <guid isPermaLink="true">https://www.realestatehomebuilder.com/ConstructionEstimates/estimated-construction-of-a-wooden-house</guid>
  22. <pubDate>Sun, 17 Sep 2023 07:08:00 +0000</pubDate>
  23. </item>
  24. <item>
  25. <title>Housing Permit</title>
  26. <description>Anna Dubian is a lawyer for KYAN. In accordance with article 51 of the Russian Federation &#039; s Code of Construction, the construction permit is a document which confirms the conformity of the project documents with the ...</description>
  27. <content:encoded><![CDATA[<img src="/img/zelenograd_novosti_vidano_razreshenie_na_stroitelstvo.jpg" alt="Выдано разрешение на" align="left" /><p>Anna Dubian is a lawyer for KYAN. In accordance with article 51 of the Russian Federation ' s Code of Construction, the construction permit is a document which confirms the conformity of the project documents with the construction plan of the plot. This document gives the developer the right to build various facilities, including housing. Individual housing permits are granted for 10 years. If necessary, according to the developer, this authorization may be extended. When the ownership of the land in Krasnodar is transferred to another person, the construction permit does not lose its legal effect. That is, after the purchase of the land, the new owner of the right to house it if all the documents necessary for it were issued by the previous owner. I remember that the question of land is crucial in any construction. There is a widespread misconception that a citizen can build anything at his or her discretion on a land owned by ownership. Not exactly. According to the law, the owner may in fact institute various capital construction facilities, including residential buildings, on land owned by him or her, but it is obliged to comply with urban and construction regulations and to use the land in accordance with his intended purpose and according to the type of use allowed. A building permit is not required in cases where you are building a residential building on a land area for horticulture or long-term management, as well as for the construction of hinges and other non-capital construction facilities, the permit is not required for the construction of economic and support structures and for the installation of a garage on a land area for individual housing construction.</p>]]></content:encoded>
  28. <category><![CDATA[Construction Permit]]></category>
  29. <link>https://www.realestatehomebuilder.com/ConstructionPermit/housing-permit</link>
  30. <guid isPermaLink="true">https://www.realestatehomebuilder.com/ConstructionPermit/housing-permit</guid>
  31. <pubDate>Thu, 07 Sep 2023 07:07:00 +0000</pubDate>
  32. </item>
  33. <item>
  34. <title>Construction Of New Russian Houses</title>
  35. <description>Construction firms and Krasnodar companies offer various technologies to build private houses. Our construction company is building private houses in Novoroskaya, Krasnodar and Krai on the new technology of the warm iron and ...</description>
  36. <content:encoded><![CDATA[<img src="/img/stroitelstvo_domov_novorossiysk_vkontakte.jpg" alt="Дизайн интерьера" align="left" /><p>Construction firms and Krasnodar companies offer various technologies to build private houses. Our construction company is building private houses in Novoroskaya, Krasnodar and Krai on the new technology of the warm iron and concrete monolith. This technology makes it possible to build a home faster, cheaper and better. The construction of the house is a " warm iron-bene monolith " , designed for a seismic in eight balls. The thermal insulation of such houses is higher than the brick wall with a thickness of 3 m, with a wall thickness of only 25 cm. In a house of 10x10 m in two floors, the inner area becomes more than 20 square metres. The walls of the whole floor are blended by concrete into one entrance without forming cold stitches in the concrete, which significantly improves the quality of construction. The surface of the walls is perfectly stable, which is achieved by the use of special mounting cassettes, excluding the ability of builders to erroneously and unevenly display the walls. The same editing tapes save money for the interior separation of the walls of the house with hypsocarton because it will not be necessary to buy guides. On the outside of the wall, a protective base covering is provided on special equipment in the zekha rather than manually from forests on the construction site. The façade of the house is thus ready for the finishing section, excluding additional work from forests and the human factor, again saving the construction budget. One plus is less labour-intensive, which means less costly in finance, the process of constructing windows. The window, along with the window, the olive, the rollets and the " key " punctures, is collected at the factory, and in the construction of the house, the design is just stacked and fixed. Finally, one of the main advantages is the speed of construction of a private house. Gathering the walls at the same floor takes one day and the bay is three hours concrete. The whole building of one floor in a day and a half!</p>]]></content:encoded>
  37. <category><![CDATA[New Construction Technologies]]></category>
  38. <link>https://www.realestatehomebuilder.com/NewConstructionTechnologies/construction-of-new-russian-houses</link>
  39. <guid isPermaLink="true">https://www.realestatehomebuilder.com/NewConstructionTechnologies/construction-of-new-russian-houses</guid>
  40. <pubDate>Mon, 28 Aug 2023 06:09:00 +0000</pubDate>
  41. </item>
  42. <item>
  43. <title>Construction Posts</title>
  44. <description>The records are 1-15 out of 15. Gravieren is an expert in paintings, writings that are performed with special tools. Armaturer (construction) - construction worker, fixer. Malar (Malar Scoture) - painter. The window wallet&#039;s ...</description>
  45. <content:encoded><![CDATA[<img src="/img/dolzhnostnie_instrukcii_i_kvalifikacionniy_spravochnik_professiy.jpg" alt="Скриншоты" align="left" /><p>The records are 1-15 out of 15. Gravieren is an expert in paintings, writings that are performed with special tools. Armaturer (construction) - construction worker, fixer. Malar (Malar Scoture) - painter. The window wallet's window wallet is an installing specialist. Measurer (ocna) is a representative of the window industry. It helps connect mass production with an individual approach and is responsible for the accuracy of design size. Pearl's the cooker and fireman. The trawler is a worker responsible for keeping the goods moving under the lift. Stolar is a master working with a tree making wood products. Mosaicnik (Mossic Technician) Mozaicnik (Mossic Technician) is a worker specializing in the mosaic unit. The meter is a builder and an accountant in the same person, a construction costing specialist. Proraba is the middle-level manager on the construction site, an intermediary between workers and their management in the construction company. Store (machine) tower cran man (machine) of the tower cran, construction company personnel involved in the recovery and movement of construction materials on the construction site for the lifting cran. The Camenclair is a worker involved in building and repair. The Engineer Building Engineer is a specialist in the planning and management of construction and repairs. Architectator Architect is a specialist in architectural design, including the development of large-scale planning and inter-referencing solutions.</p>]]></content:encoded>
  46. <category><![CDATA[Department Of Construction]]></category>
  47. <link>https://www.realestatehomebuilder.com/DepartmentOfConstruction/construction-posts</link>
  48. <guid isPermaLink="true">https://www.realestatehomebuilder.com/DepartmentOfConstruction/construction-posts</guid>
  49. <pubDate>Fri, 18 Aug 2023 05:31:00 +0000</pubDate>
  50. </item>
  51. <item>
  52. <title>Construction Of Roads And Airfields</title>
  53. <description>Three years of 10 months. Five years, four months. 5 years 4 months Future qualifications This is the level of training for graduates of secondary special and higher education institutions. Bachelor &#039; s, specialist or master &#039; s ...</description>
  54. <content:encoded><![CDATA[<img src="/img/severo_kavkazskiy_stroitelniy_tehnikum_g_vladikavkaz.png" alt="Северо-Кавказский строительный" align="left" /><p>Three years of 10 months. Five years, four months. 5 years 4 months Future qualifications This is the level of training for graduates of secondary special and higher education institutions. Bachelor ' s, specialist or master ' s qualifications are assigned to students who have completed higher vocational education programmes. The Bachelor ' s degree allows access to a master ' s degree and the qualifications of a specialist and master to postgraduate studies. The technicians and colleges receive basic or advanced training. The title of qualifications depends on the professional area. Pedagogical education involves the training of teachers, teachers or educators, medical-- midwives, feldshers, art education, an actor, an artist, a modeler. In all other areas, graduates are assigned the qualifications of technicians, technologists, technology (base level) or senior technicians, senior technologist, senior technologist, specialist (upgraded level). The technician of the future profession. Construction of road and airfield designs to participate in the design of transport facilities and their elements on roads and airfields; To develop project documentation for the production of road materials; to make calculations of the technical and economic performance of road and airfields and to carry out road and airfield maintenance work; to carry out work on the maintenance of roads and airfields in spring and autumn</p>]]></content:encoded>
  55. <category><![CDATA[Capital Construction Site]]></category>
  56. <link>https://www.realestatehomebuilder.com/CapitalConstructionSite/construction-of-roads-and-airfields</link>
  57. <guid isPermaLink="true">https://www.realestatehomebuilder.com/CapitalConstructionSite/construction-of-roads-and-airfields</guid>
  58. <pubDate>Tue, 08 Aug 2023 05:04:00 +0000</pubDate>
  59. </item>
  60. <item>
  61. <title>Neboscrub Technology</title>
  62. <description>When they talk about another record high-ranking structure, they usually say they&#039;re getting over the ground. Of course, about the height, the number of floors and elevators, the viewing areas with which half the world can see ...</description>
  63. <content:encoded><![CDATA[<img src="/img/tehnologiya_stroitelstva_visotnih_zdaniy.jpg" alt="Рис. 5" align="left" /><p>When they talk about another record high-ranking structure, they usually say they're getting over the ground. Of course, about the height, the number of floors and elevators, the viewing areas with which half the world can see, and how, for example, water can be brought to a watershed so that the pipes do not break out of enormous pressure in the pipes. Less speak of the underground, although the question of how giant, almost-kilometre " eggs " , like Burj Khalifa built or the Kingdom-building Tower, are kept in the ground is very interesting...</p>]]></content:encoded>
  64. <category><![CDATA[Construction Technology]]></category>
  65. <link>https://www.realestatehomebuilder.com/ConstructionTechnology/neboscrub-technology</link>
  66. <guid isPermaLink="true">https://www.realestatehomebuilder.com/ConstructionTechnology/neboscrub-technology</guid>
  67. <pubDate>Sat, 29 Jul 2023 04:45:00 +0000</pubDate>
  68. </item>
  69. <item>
  70. <title>Finnish Housing Technology</title>
  71. <description>Finland &#039; s carcasing technology, the first technology for the construction of fast-moving houses was found in Finland in the mid-fifty of the past century. It was characterized by the speed of construction, the ease of design ...</description>
  72. <content:encoded><![CDATA[<img src="/img/stroitelstvo_domov_po_finskoy_tehnologii.jpg" alt="Строительство домов по финской" align="left" /><p>Finland ' s carcasing technology, the first technology for the construction of fast-moving houses was found in Finland in the mid-fifty of the past century. It was characterized by the speed of construction, the ease of design, cost-effectiveness, environmental sustainability, simplicity and high heat and sound insulation. Already, carcasing houses were designed to automate the process completely. The Finnish house of those times also had mandatory design attributes without which Finnish could not be called. This should be a two-stage double-clothed roof structure with a few tampons and an open terrace. Since then, construction technologies have been significantly improved, and now we can get any configuration built on Finnish technology. But it's always convenient, always beneficial and environmentally sound. So what is Finnish construction technology, what are the principles of Finnish cabinets, and why are they so loved in northern Europe? Let us look at the advantages, basic provisions and construction phases in greater detail. The advantages of Finnish technology are light. Finnish technology means building houses that are sufficiently light to prevent recovery mechanisms from being used in construction. Any detail is raised by one or two people without a special effort. Such a format allows for the use of light, in-depth ribbons, or bases from the vintage, which significantly reduces the construction budget. Quick. If the construction of a brick building or building from blocks is delayed for a period of one and a half years, the building of a Finnish technology house is two to two and a half months. This is possible by simply compiling designs and features of construction materials used. In addition, in view of the lack of operations in the construction of " wet " (water-related works, as a component of construction materials), the Finnish technology house could be built at any time of the year, as opposed to stone buildings.</p>]]></content:encoded>
  73. <category><![CDATA[Construction Technology]]></category>
  74. <link>https://www.realestatehomebuilder.com/ConstructionTechnology/finnish-housing-technology</link>
  75. <guid isPermaLink="true">https://www.realestatehomebuilder.com/ConstructionTechnology/finnish-housing-technology</guid>
  76. <pubDate>Fri, 28 Jul 2023 15:36:00 +0000</pubDate>
  77. </item>
  78. <item>
  79. <title>Self-Regulated Organizations In Construction</title>
  80. <description>In accordance with federal legislation, the licensing of design, construction and engineering activities has been terminated since 1 January 2010. In order to carry out the work set out in the list approved by Order No. 624 of ...</description>
  81. <content:encoded><![CDATA[<img src="/img/samoreguliruemie_organizacii_v_stroitelstve_alyans_finans.jpg" alt="Саморегулируемые организации в" align="left" /><p>In accordance with federal legislation, the licensing of design, construction and engineering activities has been terminated since 1 January 2010. In order to carry out the work set out in the list approved by Order No. 624 of the Ministry of Regional Development of the Russian Federation of 30 December 2009 on engineering design, construction, reconstruction, capital construction, which has an impact on the security of capital construction (hereinafter referred to as the List), a self-regulated organization (hereinafter referred to as the CRO) is required and the CRO is allowed to do the work...</p>]]></content:encoded>
  82. <category><![CDATA[Ministry Of Construction]]></category>
  83. <link>https://www.realestatehomebuilder.com/MinistryOfConstruction/self-regulated-organizations-in-construction</link>
  84. <guid isPermaLink="true">https://www.realestatehomebuilder.com/MinistryOfConstruction/self-regulated-organizations-in-construction</guid>
  85. <pubDate>Tue, 18 Jul 2023 15:31:00 +0000</pubDate>
  86. </item>
  87. <item>
  88. <title>Construction Search</title>
  89. <description>Volgabur69 drills boreholes on water (sock, limestone) under swai, spont, anodes. Construction engineering, installation of watertight equipment. Cash and cash calculations, there&#039;s a way to undo the payment. Quality, guarantee ...</description>
  90. <content:encoded><![CDATA[<img src="/img/iziskaniya_pod_stroitelstvo.jpg" alt="Изыскания под строительство" align="left" /><p>Volgabur69 drills boreholes on water (sock, limestone) under swai, spont, anodes. Construction engineering, installation of watertight equipment. Cash and cash calculations, there's a way to undo the payment. Quality, guarantee. The drilling of the borehole on the water, the drilling of the boreholes in Tveri, the drilling of the water in the Tver, the drilling of the drilling key to the water in the Tver, the drilling of the water, the drilling of the drilling of the water, the drilling of the drilling of the water, the drilling of the borehole, the drilling of the water,</p>]]></content:encoded>
  91. <category><![CDATA[Engineering For Construction]]></category>
  92. <link>https://www.realestatehomebuilder.com/EngineeringForConstruction/construction-search</link>
  93. <guid isPermaLink="true">https://www.realestatehomebuilder.com/EngineeringForConstruction/construction-search</guid>
  94. <pubDate>Tue, 18 Jul 2023 14:38:00 +0000</pubDate>
  95. </item>
  96. <item>
  97. <title>Estimated Profits In Construction</title>
  98. <description>At the end of last year, the Ministry of Regional Development issued letter No. 41099-CC/08 of 6 December 2010. &quot; The application of overhead standards and estimated profits in construction as from 1 January 2011. &quot; Now, after ...</description>
  99. <content:encoded><![CDATA[<img src="/img/cmetnaya_pribil_v_stroitelstve_ponyatie_raschet_1.jpg" alt="Расчет сметной прибыли в" align="left" /><p>At the end of last year, the Ministry of Regional Development issued letter No. 41099-CC/08 of 6 December 2010. " The application of overhead standards and estimated profits in construction as from 1 January 2011. " Now, after some time, it is certain that questions about this document constitute an absolute majority among those that have been asked by the 2011 meters at various seminars or sent to our Internet site under " Question and Response " . I'll try to answer the most frequently asked of them...</p>]]></content:encoded>
  100. <category><![CDATA[Construction Plan]]></category>
  101. <link>https://www.realestatehomebuilder.com/ConstructionPlan/estimated-profits-in-construction</link>
  102. <guid isPermaLink="true">https://www.realestatehomebuilder.com/ConstructionPlan/estimated-profits-in-construction</guid>
  103. <pubDate>Tue, 18 Jul 2023 12:08:00 +0000</pubDate>
  104. </item>
  105. </channel>
  106. </rss>

If you would like to create a banner that links to this page (i.e. this validation result), do the following:

  1. Download the "valid RSS" banner.

  2. Upload the image to your own server. (This step is important. Please do not link directly to the image on this server.)

  3. Add this HTML to your page (change the image src attribute if necessary):

If you would like to create a text link instead, here is the URL you can use:

http://www.feedvalidator.org/check.cgi?url=https%3A//www.realestatehomebuilder.com/feed/rss/

Copyright © 2002-9 Sam Ruby, Mark Pilgrim, Joseph Walton, and Phil Ringnalda